29.01.2025
Geodetic inspection of the Rügen Bridge
Height measurements to the millimeter on Germany's largest cable-stayed bridge - we were there again. >>

25.11.2024
New face for the Brunnenweg in Lisberg
The Brunnenweg in Lisberg will soon shine in new splendor! Thanks to our design planning, the road will not only be visually upgraded, but also modernized in terms of safety.e >>

06.11.2024
Outdoor facilities Schwesterngarten Nuremberg
The redesign focused on accessibility and sustainability. >>

17.05.2024
Renovation of the Wilhelmshaven dyke bridge
Find out more about how we contributed to the renovation of the dyke bridge in Wilhelmshaven. >>

19.04.2024
Successful ongoing support for the new AVG jetty in Stade-Bützfleth
We were involved in the largest waterside construction project in Germany's ports. >>

21.02.2024
Re-measurement of watercourses as a basis for the analysis of flood hazard maps
Find out more about our contribution to updating flood hazard maps in Rhineland-Palatinate >>

24.10.2023
Repair of the Schlüsselburg lock
To support the suspension and sealing of the doors, we carried out various surveying works. >>

07.12.2022
Planning the outdoor area of Rödental elementary school
As part of the general refurbishment of Rödental elementary school, we were commissioned to plan a new outdoor area. >>

09.11.2022
Königsstuhl on the island of Rügen: Surveying during construction
The Königsstuhl on the island of Rügen is getting a new viewing platform and we are carrying out the surveys during construction. >>

09.08.2022
Survey boat meets helicopter
Our Geo South-West team carried out a very impressive job in Austria at the beginning of August. >>

20.09.2021
Surveying during planning for A20 new construction including Elbe tunnel
Planning survey for A20 new construction northwest bypass Hamburg, section 8: south of L111 (NI) - B431 (SH) including Elbe tunnel on behalf of DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH >>

07.02.2021
A20 Trebeltal Bridge: Engineering survey during construction
Engineering survey during construction (from original site to completion/open to traffic) Construction of structure 1 TBW North and structure 2 TBW North (RiFa Lübeck, length approx. 750m) >>