• Geodetic inspection of the Rügen Bridge

    29.01.2025

    Geodetic inspection of the Rügen Bridge

    Height measurements to the millimeter on Germany's largest cable-stayed bridge - we were there again. >>

  • New face for the Brunnenweg in Lisberg

    25.11.2024

    New face for the Brunnenweg in Lisberg

    The Brunnenweg in Lisberg will soon shine in new splendor! Thanks to our design planning, the road will not only be visually upgraded, but also modernized in terms of safety.e >>

  • Outdoor facilities Schwesterngarten Nuremberg

    06.11.2024

    Outdoor facilities Schwesterngarten Nuremberg

    The redesign focused on accessibility and sustainability. >>

  • Wilhelmshaven dyke bridge

    17.05.2024

    Renovation of the Wilhelmshaven dyke bridge

    Find out more about how we contributed to the renovation of the dyke bridge in Wilhelmshaven. >>

  • AVG jetty in Stade-Bützfleth

    19.04.2024

    Successful ongoing support for the new AVG jetty in Stade-Bützfleth

    We were involved in the largest waterside construction project in Germany's ports. >>

  • Re-measurement of water bodies

    21.02.2024

    Re-measurement of watercourses as a basis for the analysis of flood hazard maps

    Find out more about our contribution to updating flood hazard maps in Rhineland-Palatinate >>

  • Repair of the Schlüsselburg lock

    24.10.2023

    Repair of the Schlüsselburg lock

    To support the suspension and sealing of the doors, we carried out various surveying works. >>

  • Rödental elementary school

    07.12.2022

    Planning the outdoor area of Rödental elementary school

    As part of the general refurbishment of Rödental elementary school, we were commissioned to plan a new outdoor area. >>

  • Surveying during construction

    09.11.2022

    Königsstuhl on the island of Rügen: Surveying during construction

    The Königsstuhl on the island of Rügen is getting a new viewing platform and we are carrying out the surveys during construction. >>

  • Survey boat meets helicopter

    09.08.2022

    Survey boat meets helicopter

    Our Geo South-West team carried out a very impressive job in Austria at the beginning of August. >>

  • A20 New construction

    20.09.2021

    Surveying during planning for A20 new construction including Elbe tunnel

    Planning survey for A20 new construction northwest bypass Hamburg, section 8: south of L111 (NI) - B431 (SH) including Elbe tunnel on behalf of DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH >>

  • Engineering survey during construction

    07.02.2021

    A20 Trebeltal Bridge: Engineering survey during construction

    Engineering survey during construction (from original site to completion/open to traffic) Construction of structure 1 TBW North and structure 2 TBW North (RiFa Lübeck, length approx. 750m) >>