New A 281 Highway – Construction Phase 4: Bremen Weser Crossing
The fourth construction phase of the A 281 is creating a four-lane highway connection in Bremen that is approximately 4.9 km long. A key component is the 710-meter-long Weser River crossing, which consists of a floating and immersed tunnel. In addition, there are tunnel sections constructed using the cut-and-cover method on the north side (length: 208 meters) and on the south side (length: 197 meters).
Our team at Geo Nord-West is responsible for surveying-based construction supervision on this major project. This includes pre-construction surveying, the creation and verification of survey programs, as well as control surveys and calculations. In addition, the contractor’s survey data is collected and consolidated into central databases.
Precision total stations (Leica TS60), precision levels (Leica DNA03), and GNSS-RTK systems (Leica GS05) are used for the work.
The project will be carried out from 2019 to 2030 on behalf of the ONP–IMDC consortium. The project owners are DEGES and the federal government’s Autobahn GmbH. With a total budget of approximately 775 million euros, the project is one of the largest infrastructure projects in Bremen.
More information about the project: