Surveying during planning for A20 new construction including Elbe tunnel

Planning survey for A20 new construction northwest bypass Hamburg, section 8: south of L111 (NI) – B431 (SH) including Elbe tunnel on behalf of DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH

Section 8 has a total length of 8.56 km.

Service content:

  • Determination of surveying principles,
  • Participation in the announcement of the surveying work,
  • Checking the control point network,
  • Supplementary local basic data collection,
  • Transfer of existing survey data,
  • Detailed field comparison in the construction sector,
  • Production of basic surveying plans,
  • Creation of digital terrain models.

Local newspaper reports on surveying work

Newspaper report – Measuring for tunnel construction

GEO Group - Measuring
GEO Group - Boat